§ 52.21. CONNECTION CHARGES.  


Latest version.
  • Each applicant shall pay a charge to cover the costs of excavating and tapping the main; furnishing and installing service pipe from the main to the lot line; furnishing and installing corporation and stop cocks; and furnishing and installing meter cock (if outside), yoke and meter. The charge for a ¾-inch meter tap shall be $900. The charge for a 1-inch meter tap shall be $1,100. The charge for a tap larger than the 1-inch meter tap shall be $1,100, plus the cost of labor, materials, power machinery, transportation, and overhead incurred for installing the tap (the town may elect to have a licensed contractor to install all necessary equipment in which the cost shall be borne onto the applicant).
    (`93 Code, § 9-16) (Ord. 511, passed 10-28-91; Am. Ord. 2003-018, passed 9-8-03; Am. Ord. 2013-014, passed 11-11-13)